Kul concrete volume

1.98m³

Kul concrete volume

69.92cft

Volume breakdown

Footing volume

1.62m³

PCC bed volume

0.36m³

50 kg cement bags

15bags

Reti required

29.90cft

Aggregate required

59.80cft

Material cost ka anuman

₹10,934

गणना कैसे होती है

सूत्र

  1. Imperial ho to ft → m convert
  2. footing_volume = length × width × footing_depth
  3. pcc_volume = length × width × pcc_thickness
  4. footing_volume ko selected grade ratio se split → cement, reti, aggregate
  5. pcc_volume ko M10 ratio se split → cement, reti, aggregate
  6. Cement volumes combine karein → bags; reti/agg combine → cft (× 35.3147)
  7. cost = bags × ₹/bag + (reti_cft + agg_cft) × ₹/cft

मान्यताएँ

  • Foundation ko PCC bed + footing maana — dono length × width rectangles.
  • Sabhi dimensions ke liye Metric (m) ya Imperial (ft) chunein।
  • PCC (levelling) bed hamesha M10 (1:3:6) — footing aapke selected grade se।
  • Material split har layer ke liye grade mix aur dry volume × 1.54 se।
  • Cement bags 50 kg standard Indian bags, PCC + footing combined।
  • Cost = (cement bags × ₹/bag) + ((reti + aggregate) cft × ₹/cft)।
  • Excavation, steel, formwork, mazdoori shamil nahi — grade aur depth structural drawing se confirm karein।